Page 346 - Forensic Structural Engineering Handbook
P. 346

TEMPORARY STRUCTURES IN CONSTRUCTION         10.33

























                                            (e)































                                             (f)
                 FIGURE 10.4 Denver I-70 overpass. (Continued) (e) Reassembled upper tier of scaffolding/
                 shoring tower. (From R. T. Ratay Engineering, P.C.) (f) Schematic cross-section of bridge with
                 scaffolding/shoring tower in place. (From R. T. Ratay Engineering, P.C.)
   341   342   343   344   345   346   347   348   349   350   351