Page 346 - Forensic Structural Engineering Handbook
P. 346
TEMPORARY STRUCTURES IN CONSTRUCTION 10.33
(e)
(f)
FIGURE 10.4 Denver I-70 overpass. (Continued) (e) Reassembled upper tier of scaffolding/
shoring tower. (From R. T. Ratay Engineering, P.C.) (f) Schematic cross-section of bridge with
scaffolding/shoring tower in place. (From R. T. Ratay Engineering, P.C.)