Page 347 - Forensic Structural Engineering Handbook
P. 347

(g)

































                                           (h)
                  FIGURE 10.4  Denver I-70 overpass. (Continued) (g) Dimensions of scaf-
                  folding/shoring tower. (From R. T. Ratay Engineering, P.C.) (h) Presentation
                  board showing tower and two workers prepared for the jury trial. (From R. T. Ratay
                  Engineering, P.C.)

                                         10.34
   342   343   344   345   346   347   348   349   350   351   352