Page 171 - Formulas and Calculations for Petroleum Engineering
P. 171
164 Formulas and calculations for petroleum engineering
Output(s)
W max : Maximum Allowable Mud Weight (ppg)
Formula(s)
P lo
W ¼ + W
max u
0:052 H
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 150.
2.214 Subsea considerations—Casing pressure decrease when bringing well on choke
Input(s)
SICP: Shut in casing Pressure (psi)
CLPL: Choke Line Pressure Loss (psi)
Output(s)
P r : Casing Pressure Decrease when bringing well on choke (psi)
Formula(s)
P r ¼ SICP CLPL
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 144.
2.215 Subsea considerations—Velocity through choke line
Input(s)
Gpm: Mud Circulation rate (gpm)
ID: Choke line ID (in.)
Output(s)
V: Velocity through Choke Line (ft/min)
Formula(s)
Gpm
V ¼ 24:5
ID 2
Reference: Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 148.
2.216 Surface test pressure required to frac the formation
Input(s)
FG: Fracture Gradient (psi/ft)
D: Depth (ft)
r: Mud Density (ppg)