Page 172 - Formulas and Calculations for Petroleum Engineering
P. 172

Drilling engineering formulas and calculations Chapter  2  165



             Output(s)

                P ST :  Surface Test Pressure (psi)


             Formula(s)


                                                       ð
                                                  P ¼ FG DÞ  0:052 r DÞ
                                                                ð
                                                   ST
             Reference: Suman Jr, G. O., & Ellis, R. C. (1977). Cementing Handbook. World Oil, Page: 69.

             2.217 Total amount of solids generated during drilling

             Input(s)
                C h :  Capacity of Hole (bbl/ft)
                L:   Footage Drilled (ft)
                SG:   Specific Gravity of Cuttings (unitless)
                Ø:   Porosity (fraction)


             Output(s)

                W s :  Amount of Solids Generated (pounds)


             Formula(s)


                                                 W ¼ 350   C   L   1 Øð  Þ   SG
                                                   s        h
             Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
             Gulf Professional Publishing, Page: 19.



             2.218 Total heat energy consumed by the engine

             Input(s)
                w f :  Mass Rate of Fuel Consumption (lbm/min)
                H:   Heating value of Fuel (ft lbf/Btu)



             Output(s)
                Q i :  Total Heat Energy consumed by the Engine (hp)



             Formula(s)

                                                              w H
                                                                f
                                                         Q ¼
                                                          i
                                                             33;000
             Reference: Bourgoyne, A. T., Millheim, K. K., Chenevert, M. E., & Young, F. S. (1986). Applied Drilling Engineering,
             Page: 6.
   167   168   169   170   171   172   173   174   175   176   177