Page 93 - Formulas and Calculations for Petroleum Engineering
P. 93

86  Formulas and calculations for petroleum engineering



              Output(s)

                                        3
                 AC:   Annular Capacity (ft /ft)
                                          3
                 CC  ** :  Casing Capacity (ft /ft)
                                      3
                 C c :  Casing Capacity (ft )
                                       3
                 V s :  Volume of Slurry (ft )
                 h a :  Height of Cement in Annulus (ft)
                                                      3
                 h tc :  Depth of Top of Cement in Annulus (ft /stroke)
                 N m :  Number of Barrels of Mud Required to Displace the Cement (bbl)
                 S:  Number of Strokes Required to Displace the Cement (Strokes)
              Formula(s)

                                                              2
                                                             H  OD  2
                                                        AC ¼
                                                              183:35
                                                                  2
                                                               ð IDÞ
                                                         CC ¼
                                                              183:35
                                                         C ¼ N   Y
                                                           c   s   s
                                                      V ¼ h  h Þ   CC
                                                           ð
                                                        s   c   sd
                                                             ð V  C Þ
                                                                   c
                                                               s
                                                         h ¼
                                                          a    AC
                                                                E
                                                          h ¼ h  h
                                                           tc  c   a
                                                         N ¼ h   DC
                                                          m    sd
                                                               N m
                                                           S ¼
                                                               PO
              Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
              Gulf Professional Publishing, Page: 57.

              2.29   Calculations required for spotting pills

              Input(s)
                 hd:  Diameter of Hole (in.)
                 pd:  Diameter of Drill Pipe (in.)
                 cd:  Diameter of Drill Collar (in.)
                 L s :  Length of Section (ft)
                 L e :  Length Above the Collar (ft)
                 WF:   Washout Factor (fraction)
                 V ds :  Volume Left in Drill String (bbl)
                 C dc :  Drill Collar Capacity (bbl/ft)
                 C dp :  Drill Pipe Capacity (bbl/ft)
                 L:  Length (ft)
                 PO:   Pump Output (bbl/stroke)
                 S ds :  Strokes of Drill Pipe (fraction)


              Output(s)

                 AC dc :  Annular Capacity of Drill Collar (bbl/ft)
   88   89   90   91   92   93   94   95   96   97   98