Page 94 - Formulas and Calculations for Petroleum Engineering
P. 94

Drilling engineering formulas and calculations Chapter  2  87




                AC dp :  Annular Capacity of Drill Pipe (bbl/ft)
                V dc :  Volume in Drill Collar (bbl)
                V dp :  Volume in Drill Pipe (bbl)
                V a :  Volume of Pill Required in Annulus (bbl)
                V ts :  Total Volume of Pill Required (bbl)
                C t :  Total Capacity of Drill String (bbl)
                S pp :  Strokes for Pump Pill (no.)
                V cp :  Volume Req for Chase Pill (bbl)
                S cp :  Strokes for Chase Pill (no.)
                S t :  Total Strokes to Spot the Pill (no.)



             Formula(s)

                                                               2      2
                                                            ð hdÞ   cdðÞ
                                                     AC ¼
                                                        dc
                                                              1029:4
                                                               2      2
                                                            ð hdÞ   pdÞ
                                                                  ð
                                                     AC ¼
                                                        dp
                                                              1029:4
                                                     V ¼ AC   L   WF
                                                       dc    dc  s
                                                     V ¼ AC   L   WF
                                                                 e
                                                             dp
                                                       dp
                                                        V ¼ V +V
                                                         a    dc  dp
                                                        V ¼ V +V  ds
                                                              a
                                                          ts

                                                   C ¼ C Þ   L +C       L
                                                       ð
                                                     t   dc   s    dp
                                                               V ts
                                                          S ¼
                                                           pp
                                                               PO
                                                        V ¼ C  V
                                                          cp   t   ds
                                                             V cp

                                                       S ¼       +S ds
                                                        cp
                                                             PO

                                                      S ¼ S    +S
                                                       t    pp     cp
             Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
             Gulf Professional Publishin, Page: 75.
             2.30    Capacity formulas—bbl/ft
             Input(s)
                d h :  Inside Diameter of Casing (in.)
                d p :  Outside Diameter of Casing (in.)



             Output(s)
                AC:   Annular Capacity (bbl/ft)
   89   90   91   92   93   94   95   96   97   98   99