Be st Practice 1 2.4          Implementation and Communication Best Practices

        Table 12.4.1 Workshop Agenda
                    SESSION      DESCRIPTION                                       CHAPTER )      TAB ))  MODULE

        DAY 5       33, 34       STEAM TURBINE PERFORMANCE CHARACTERISTICS         21             302
                    35, 36       STEAM TURBINE MECHANICAL DESIGN                   22             303
                    37           STEAM TURBINE INLET STEAM REGULATON               23             314
                    38, 39       STEAM TURBINE CONTROL AND PROTECTION SYSTEMS      24             315
                    40           STEAM TURBINE OPERATION                           25             316

        Course B
        FORSTHOFFER ASSOCIATES INC.
        The Crossings                                        (215) 321-1907
        1098 Washington Crossing Road e Suite 4              (215) 321-1908
        Washington Crossing, Pennsylvania 18977              FAX (215) 321-1909

        ROTATING EQUIPMENT RELIABILITY OPTIMIZATION WORKSHOP
        Notes: Tab ¼ Tab in Supplementary Manual
        Chapter ¼ Chapter in Forsthoffer's Machinery Handbook Volume 5

        1.6        SESSION                        DESCRIPTION                       CHAPTER )     TAB ))  MODULE
        1.6.1      DAY 1
        1, 2       WORKSHOP INTRODUCTION & OVERVIEW                                 1             1  112.01
                   INTRODUCTION                                                                   1  12.02

                   WORKSHOP OBJECTIVES
                   INSTRUCTOR & STUDENT INTROS
                   WORKSHOP AGENDA
                   FORMAT & SCHEDULE
                   BENEFITS & DUBAI PETROLEUM CONTRIBUTIONS
                   FUNDAMENTALS & RELIABILITY TERMS
        3-8        THE CAUSES OF MACHINERY FAILURES (5 WHYS)                        2             2  927
                   “FAILURES ARE NOT RANDOM”
                   PROCESS CONDITION CHANGES
                   INSTALLATION ERRORS
                   OPERATING PROCEDURES
                   DESIGN PROBLEMS
                   COMPONENT WEAROUT
                   CLASSROOM EXERCISE
        1.6.2      DAY 2
        9-14       ROOT CAUSE FAILURE                                               5             3  942
                   ANALYSIS PROCEDURE
                   INTRODUCTION
                   PROCEDURE OVERVIEW
                   SPECIFIC ANALYSIS DETAILS
                   CLASSROOM EXERCISES 1, 2, 3, & 4

        DAY 2
        15, 16     RCFA EXAMPLE                                                     6             4  943
                   INTRODUCTION TO PROBLEM

                   PROBLEM e CLASS & INSTRUCTOR

        DAY 3
        17-24      DESIGN SCREENING EXAMPLES (ANALYSIS TECHNIQUES)                  7             5  960
                   ROTORS e THE EFFECT OF PROCESS HEAD                                            136,515
                   JOURNAL BEARINGS & VIBRATION                                                   126
                   THRUST BEARINGS & BALANCE DRUMS                                                132
                   PUMP MECHANICAL SEALS                                                          220
                   COMPRESSOR SEAL SYSTEMS (LIQUID AND DRY GAS)                                   712,713,714,715
                   AUXILIARY SYSTEMS                                                              701
        DAY 4
        25-27      ROOT CAUSE FAILURE ANALYSIS EXERCISES                                          6  112.03
                   NOTE: CLASS WILL BE DIVIDED INTO 4 GROUPS AND EACH ASSIGNED AN EXERCISE
                   FACT FINDING e FROM SITE INFORMATION
                   PACKAGE & COMMUNICATION WITH PLATFORMS