                   The test was conducted in 2014. There were one injection well and several offset
                wells. In the first 3 months, the well injection rate was 1700 STB/day and later
                reduced to 1000 STB/day because of breakthrough at a close offset well [40]. The
                close offset well (about 880 ft away) had a huge increase in water production, but the
                oil rate did not increase during this time. The water broke after 1 week.
                   One water huff-n-puff pilot test was conducted in the North Dakota part of the
                Bakken Formation in 2012. The injection time was just over 1 month, the soaking
                time was 2 weeks, and the production time was 3 4 months. The injection rate was
                1200 bbl/day. No water injectivity problem was observed, but little to no oil rate was
                increased [40].
                   According to the pilot test of produced water re-injection with huff-n-puff setting
                that has been done in the Parshall field, there is no significant improvement of the oil
                recovery factor after employing such a method. In this scenario that is performed on
                spring of 2012, the duration of water injection was about 30 days and 10 days as a
                soaking period; after that time the production was open to flow [1].
                   Table 9.2 presents several field tests that have been performed in shale oil reservoirs
                located in China. This table provides general information regarding the type of injec-
                tion mode as well as rock and fluid characterization (some of them not reported).
                Also, the performance of each field test is reported in Table 9.2 [1].
                   Huff-n-puff water injection was also performed in the Chang 6 reservoir,
                Yanchang oil field near Qieli Village, Ordos Basin, China (huff-n-puff 4 in
                Table 9.2) [1].
                   Huff-n-puff water injection was also successfully tested in Toutai reservoir,
                Daqing. The permeability was 1.25 mD, and the huff-n-puff cycle was half to one
                year [1]. Huff-n-puff water injection was tested in 2007 in Well Niu 15-5 in
                Niuquanhu reservoir, Tuha Field. The permeability in this area was 0.42 7.84 mD.
                The soaking time was 108 days. Two cycles were performed with incremental oil of
                1816 tons [1]. Huff-n-puff water injection was performed in Duha Field, Xingjiang,
                China (huff-n-puff 5 in Table 9.2). Water was injected in Well Ma-55 from July 18,
                                                               3
                2014 to July 24, 2014. The injection rate was 285 m /day. The total injected water
                                  3
                volume was 2000 m . The oil rate before water injection was 0.9 tons/day and the
                water cut was 16%. After the huff-n-puff water injection, the oil rate was 5 tons/day
                and the water rate was kept constant until the reporting date (August 2015) [1].



                     9.4 ENVIRONMENTAL ASPECTS OF SHALE OIL
                     AND GAS PRODUCTION

                     Owing to the growing concern regarding climate change and energy demand,
                using natural gas as a clean-burning and affordable source of energy has been
   289   290   291   292   293   294   295   296   297   298   299