Page 63 -
P. 63

38  •  Green Project Management



                5.  Quote provided by William McDonough, FAIA, used with permission.
                6.  The Natural Step, “4 Sustainability Principles,” http://www.naturalstep.org/.
                7.  J.  LeRoy  Ward,  Dictionary  of  Project  Management  Terms  (Arlington,  VA:  ESI
                 International, 2008).
                8.  Starbucks  Corporation,  Fiscal  2007  Corporate  Social  Responsibility  Annual  Report,
                 http://www.starbucks.com/aboutus/csrreport/Starbucks_CSR_FY2007.pdf.
                9.  Scott Case (TerraChoice to U.S. Congress), quoted in “Eco-design or Greenwash?
                 Steering a Path through the Misinformation,” presentation by Christopher Kadamus,
                 Cambridge Consultants, Cambridge, England, http://www.cambridgeconsultants.com,
                 October 20, 2009, used with permission.
               10.  Oxford English Dictionary (2nd ed.), 2009.
               11.  The  Green  Life,  Featured  Greenwasher,  http://www.thegreenlifeonline.org/green-
                 washerfebruary2006.html.
               12.  Ibid.
               13.  “Eco-design  or  Greenwash?,”  presentation  by  Christopher  Kadamus,  Cambridge
                 Consultants, Cambridge, England, http://www.cambridgeconsultants.com, October
                 20, 2009, used with permission.
               14.  American Wind Energy Association, Wind Energy Basics: What Is Wind Energy?,
                 http://www.awea.org/faq/wwt_basics.html.
               15.  The California Energy Commission, Energy Story, Chapter 15: Solar Energy, http://
                 www.energyquest.ca.gov/story/chapter15.html.
               16.  National Science Foundation, Fact Sheet: What Is Green Gasoline?, http://www.nsf.gov/
                 news/newsmedia/greengasoline/index.jsp.
               17.  WāstAway, welcome message on home page, http://www.wastaway.com/.
               18.  Storm Cunningham, “Global Trends in Project Management, ” in Project Management
                 Circa 2025, ed. David Cleland and Bopaya Bidanda (Newtown Square, PA: Project
                 Management Institute, 2009).
   58   59   60   61   62   63   64   65   66   67   68