LIST OF DOCUMENT TYPES TO BE PRODUCED DURING A PROJECT      549

           • Detail design diagrams and drawings for the earthing of equipment and systems, for both large
             and small equipment including non-electrical items such as vessels and fences.


           E.2 MANUFACTURERS DOCUMENTS

           E.2.1 Feasibility Studies

           The manufacturers documents may include quotations for particular items of equipment such as
           generators, large motors and main switchboards. These quotations would include technical information
           and budget cost estimates, and possibly references to other customers and projects.


           E.2.2 Conceptual Design

           The manufacturers documents may include the following:-

           • Document list and index.
           • Report for the functional design of the power management system.
           • Plans and elevations for the power management system equipment.
           • Single-line diagrams for the switchboards.
           • Single-line diagrams for the motor control centers.
           • Schedules of switchboard protective devices.
           • Brochures for the protective relaying equipment.
           • Setting up and commissioning manuals for the protective relaying equipment.
           • Plans, elevations and sections of switchboards and motor control centers.
           • Plans, elevations and sections of generators and their prime movers.
           • Plans, elevations and sections of large motors and their driven machines.
           • Plans, elevations and sections of power transformers and reactors.
           • Termination details in major equipment terminal boxes, e.g. generators, HV motors, optional.


           E.2.3 Detail Design

           The manufacturers documents may include the following:-

           • Document list and index.
           • Report for the functional design of the power management system.
           • Plans and elevations for the power management system equipment.
           • Single-line diagrams for the switchboards.
           • Single-line diagrams for the motor control centers.
           • Schedules of switchboard protective devices.
           • Brochures for the protective relaying equipment.
           • Setting up and commissioning manuals for the protective relaying equipment.