Page 100 - How To Implement Lean Manufacturing
P. 100

Cabinet Manufacturing Smaller Lot Production - 5 batches of 20 Units each  650  600  550  500  450  400  350  300  250  Job Duration - Minutes




                                                                   200


                                                                   150


                                                                   100



                                                                   50



                               Assemble Cabinet   4.5 min/cab (7+1)  Press Break BS 1.2  min/assy  Deburr Bottomside  0.6 min/assy  Turret Bottomside 2  min/assy  Press Break TS 1.2  min/assy (!)  Deburr Topside 0.6   min/assy (1)  Turret Topside 2  min/assy (1)  Small lot production.



                                                                             FIGURE 5-2





         80
   95   96   97   98   99   100   101   102   103   104   105