Page 253 - Hydrocarbon Exploration and Production Second Edition
P. 253

240                                Production Testing and Bottom Hole Pressure Testing






































          Figure 10.11  Gauge cable and clamp being installed beside tubing (photograph copyright
          H. Crumpton).


                         test string
               open hole
               section             inflatable
                                   packer
                                            reservoir




             perforated           inflatable
               joint               packer
                           plug
                       Open hole DST                       Cased hole DST
          Figure 10.12  Drill stem testing (DST).


          prevented by the upper packer, and a good seal is required to ensure safety.
          Therefore the openhole DST can only be run where the openhole section is in
          gauge. The safe length of the openhole test section would be determined by the
          strength of the casing shoe. If several intervals are to be tested independently, then a
   248   249   250   251   252   253   254   255   256   257   258