342   Improving Machinery Reliability

                         c. Spare rotor storage and protection.
                         d. Review stocking for completeness and adequacy.
                       16. Outline lubrication requirements:
                         a. Determine requirements for each machine.
                         b. Verify appropriate product equivalent of vendor-recommended lubricants.
                         c. Procure ample quantity for startup. Stock quantity to replenish possible seal
                           leakage. Allow for discard of initial charge.
                         d. Periodically sample test during operations.


                                       Machinery Startup Review Tasks

                       The preceding section outlined startup preparation in broad terms. These prepara-
                     tory tasks can be further broken down into completeness reviews, quality assurance
                     tasks, cleanliness checks, etc.
                       The following man-hour percentages could be considered representative for exe-
                     cuting the field construction completeness review tasks associated with the startup of
                     a world-size steam cracker (ethylene plant):


                       Review completeness of installation (“but-list”)-21%
                        Traps
                        Vents
                        Valves
                        Plugs
                        Coupling guards
                        Lube supply lines

                       Review maintainability  of equipment-7%

                        Spool pieces
                        Shims
                        Auxiliary line interference
                        Alignment devices

                       Ensure long-term, troublefree operation4%

                         Determine offset values needed to accommodate thermal growth
                         Verify stress-free installation of machinery piping
                         Gear-tooth contact checks