P. 379

Startup Responsibilities   345









                     Block #-System   ,+-   Centrifugal Pumps   Equipment #
                      BaseDlate                  I  I  Pipe Supports          I *
                      Case                           Small-Bore Piping
                      Packing or Seal Gland          Lubrication
                      Packing or  Seal Piping        Guards
                                                                                ~
                      Suction Pioina
                     I Strainer                  I I                          It
                      Discharge Piping           1 1                          I
                      Remarks, Incomplete Items. Deviations, elc:




                     I                                                           I
















                      Mechanical Inspector   (M)    ’
                      Process Inspector   (P)          Name
                      Mechanical Engineer   (T)        Date
                      Process Enoinnnr   IT\

                   Figure 8-1. Completeness summary form for centrifugal pumps. This summary should
                   only be filled in by the reviewer after a careful on-site review has verified compliance
                   with a “detailed checklist for rotating machinery.” The reviewer will  normally compile
                   such a detailed checklist from the purchaser’s original specification.