Page 379 - Improving Machinery Reliability
P. 379
Startup Responsibilities 345
Block #-System ,+- Centrifugal Pumps Equipment #
BaseDlate I I Pipe Supports I *
Case Small-Bore Piping
Packing or Seal Gland Lubrication
Packing or Seal Piping Guards
~
Suction Pioina
I Strainer I I It
Discharge Piping 1 1 I
Remarks, Incomplete Items. Deviations, elc:
I I
Mechanical Inspector (M) ’
Process Inspector (P) Name
Mechanical Engineer (T) Date
Process Enoinnnr IT\
Figure 8-1. Completeness summary form for centrifugal pumps. This summary should
only be filled in by the reviewer after a careful on-site review has verified compliance
with a “detailed checklist for rotating machinery.” The reviewer will normally compile
such a detailed checklist from the purchaser’s original specification.