Page 377 - Improving Machinery Reliability
P. 377

Startup Responsibilities   343

                     Driver solo runs and rotation checks-9%

                      Steam-turbine overspeed trip settings
                      Vibration measurements

                     Cleanliness checks-5%

                     0 Lube and seal oil systems
                      Steam-turbine inlet piping
                      Pump mechanical seals

                     Autostart simulations (joint mechanical/instrument  technician effort)-lS%


                     0 On lube and seal oil auxiliaries
                     0 On other autostart drivers


                     Documentation, ix., assembling the following data-3.5%

                       Acceptance forms
                       Equipment record folders
                     0 Computerized record input data form
                       API data sheets
                     0 Cross-sectional drawings
                       Spare parts availability
                       Mechanical-seal dimensions
                       Alignment form
                     0 Startup failure history
                       Startup checklists
                       Lubrication survey


                     Muchineiy repairs-39%
                     0 Precautionary disassemblies
                      0 Component (material) modifications
                       Cleaning, reassembling, and general repairs


                     Miscellaneous--I  1 %
   372   373   374   375   376   377   378   379   380   381   382