Master Data       195



                           Figure 6-14 presents a component assignment that includes three opera-
                       tions in the routing and three materials in the BOM. Material A is assigned to
                       Operation 20, while materials B and C are assigned to Operation 30. The right
                       side of the fi gure indicates that the materials are consumed at the beginning of
                       the operations. Any materials that are not explicitly assigned to an operation
                       are automatically assigned to the fi rst operation and consumed at the beginning
                       of that operation.





















                        Figure 6-14: Component assignment


                           In addition to indicating how and from which materials fi nished goods or
                       semifi nished goods are produced, the data contained in bills of material, work
                       centers, and routings are used to determine production capacity. Production
                       capacity is a measure of how many units of a material a plant can produce
                       within a given timeframe. For example, GBI’s Dallas plant can produce either
                       15 bikes or 10 bikes and 50 wheel assemblies per day. Figure 6-15 presents an
                       example of a production plan for the Dallas plant, utilizing its full capacity.































                       Figure 6-15: Sample GBI production plan