Hydropower Life-Cycle Inventories                               253

               Water


               Cement
              production
                         Concrete
                         Production
              Gravel


               Sand                CONSTRUCTION
              Rocks

              Wood
                                                                        Steel
               Diesel     Earth                                       production
             production   works
                                                                       Copper
              Explosive                                 Equipment     production
              production                               manufacture
                                                                        Oil
                                                                      production


                                     OPERATION

                   OBS: Transport operations were included, but are not indicated on the figure;
                          processes represented with dotted lines are not included;
            Fig. 2 Simplified product system boundary for Itaipu power plant LCI (Ribeiro 2003)

                   0
              Itaipu s LCI data collection was performed in two sequential steps: Itaipu
            Power Plant data; and material and energy life-cycles data. Both are described in
            more details in the following paragraphs.
              Itaipu Power Plant data
              The first part of data collection was the adjustment of the product system model
                                         0
            from international studies, to Itaipu s reality.
              In order to obtain information for the essential considerations, personal inter-
            views were conducted during a field trip to the dam, with some civil work spe-
                                         0
            cialists who had worked in Itaipu s project and construction. The information
            collected by interview was completed by an extensive literature review carried out
            on the first part of the study. This included power plant construction reports (from
            1977 to 2003); lists of materials and equipment; original blueprints; reports from
            the different engineering companies that worked in the power plant project and
            construction; and technical articles published on a monthly civil engineering
            magazine (editions from 1976 to 1983). All of these data, together with the pre-
            vious collected information, made it possible to conduct the necessary calcula-
            tions, summarized in the annexes of the original study (Ribeiro 2003).