Page 55 - Machinery Component Maintenance
P. 55

40   Machinery Component Maintenance and Repair

                                               IRcknuuJsT
                               We1 No.:  9EH  1B  MH  Sean Wine
                               Package No.:   052-02
                               Work  Order No.:   6305
                             1W-t      No.:   CT-01                          I

                        20.   ckck ad record  clearances as per Machinery Reliability progran.
                             Use farms in INSPBXfcXJ  aEUUNrZ FORM section.
                        21.   Disassemble  governor end  and exhaust  erd  packing  hsi-gs
                             (see h-oadures-packirg  kusings).  Take  top clearances on
                             bth upper  blves.
                        22.  mck  and  Record  clearances as pr Machinery Reliability Program.
                             Use fom in INSPElXtoN  UZUUNCE     section.
                        23.   RBnnre upper  halves of  Radial bearings and  thrust bearing  assenbly.
                             Visually inspect , take clearance cM on  each bearing, thzn
                             r-e   to make  rotor  ready  for rem-1.   (See h-ocedure-Radial  Brg.
                             6  Thrust  Brg.  AsseTlbly.)
                        24.   Cteck  and recnrd as per Maw Reliability Progran.  Use fom
                             in mSPDc??oN m  C  €  FOIW  section.
                        25 -  mve  rotor  fran 1-r   half  of  turbine  case.  (For propex
                             rigging  see Pnredure-Rotor  Assa-bly.)
                        26.  Rarove all upper  C  lower  half  padcirq.  oil seals,  etc.  mk for
                             position.  clean and  cover  until ready  for re-installation.   (Set
                             --Interstage      Fadung).
                        27.   Parove upper  and  lower  half  diaphragm.  clean,  inspect/repir
                             procedure-Diaphragms ) .
                             non4estructive test and CDVer until re-installation  (.%e
                        28 :  Renwe  laver half radial bearings,  and tkust assehly busmg.
                             (.See  procedure-mal Brgs.  6  Thrust Brg.  Assenbly).
                        29.   Clean  lower  and upper  halves of  turbme  cas-   and prepare  for
                             re-installation  of  diaphraqs.
                                                                              -
                        30.   Qean inside of  relay bs. lower  Mf bear-   hn~~ings
                         31.   Clean, inspecthepair,  and non-destractive  test mtzles.
                         32.   Install  tenninal  strips inside of  each end bearirg bus-   for
                              new  them-omple  wires.
                         33.  kpau 660#  stean extraction leak at flange.
                                                            CT-02 -
                         34.  Repair hxizontal  joint leak cm
                         35.   Install new  coupling end oil seals.
                         36.   Install new  revised grod brusks.
                         37.   ine-all  new  governor.



                                     MACHINERY RELIABILITY PROGRAM
                   -3of6

                              Figure 2-8. Typical worklist page for major compressor turnaround.