Page 165 - Managing Global Warming
P. 165

Moisture
          Reactor                 separator
                                  reheater
                                         L. P.
                                        turbine              Generator

                                                                         Stack
                           H. P.                                 Cooling water
                          turbine
                                                               Off-gas treatment
           Feedwater line                                         system
                           Main
                          condenser
                                                                    Air
                                                                   ejector
                                                        L.P. condensate
                 High pressure                             pump
                feedwater heaters
                                                              Grand steam
                                                              condenser
                                               Low pressure
                               FW             feedwater heaters
                               pump
                                                         Condensate
                                                        demineralizer
                                              H.P. condensate
                                                 pump
               H.P. drain
                tank                                          Hollow condensate
                                                                   filter
                                    L.P. drain
                           L.P. drain       L.P. drain
                            pump      tank    pump
         Fig. 4.10 Simplified layout of ABWR NPP [1].
         Based on data from Toshiba. Leading innovation. Advanced Boiling Water Reactor (ABWR),
         Booklet, Toshiba Corporation, Japan; 2011.

         Fig. 4.11 T-s diagram for
         typical ABWR NPP Rankine
         steam-turbine cycle (reheat
         pressure was assumed to be
         ¼ of the main steam
         pressure) [1].
   160   161   162   163   164   165   166   167   168   169   170