Page 168 - Managing Global Warming
P. 168
Fig. 4.13 Layout of EC6 NPP [1]: (1) Reactor building; (2) calandria vessel; (3) turbine
building; (4) turbine generator; (5) service building; (6) spray system; (7) pressurizer; (8)
heat-transport pumps; (9) steam generators; (10) heat-transport system; (11) fuelling machine
for online refueling (one machine on one side of calandria vessel and another on another side);
and (12) Reserve water tank.
Courtesy of SNC-Lavalin.
Fig. 4.14 Barriers for prevention of releases [1].
Courtesy of SNC-Lavalin.

