Page 172 - Managing Global Warming
P. 172
Current and future nuclear power reactors and plants 135
Fig. 4.17 T-s diagram of 515-MW el CANDU reactor Pickering NPP (Ontario, Canada) Rankine
steam-turbine cycle [1]. (It should be noted that EC6 reactor has higher power-cycle
working-fluid parameters.)
Fig. 4.18 Simplified PHWR NPP flow diagram (Siemens design) (Atucha, Argentina) [1].
Currently, both Unit 1 (335MW el ) and Unit 2 (692 MW el ) are in operation.
Based on Nuclear Engineering International, September 1982, England.