140 Managing Global Warming
P = 2.45 MPa
T = 505°C
10
P = 14.2 MPa Reheater
T = 505 C 0 9
HPT IPT LPT
Steam generator 1 2 Deaerator 3 4 5 6 7 11 Condenser
P c = 5 kPa
Pump
Feed
pump
X 1 X 2 X 3 X 4 X 5 X 6 X 7
T = 240°C
fw
HPH 3 HPH 2 HPH 1 LPH 4 LPH 3 LPH 2 LPH 1
Fig. 4.26 Thermodynamic layout of 600-MW el BN-600 SFR NPP [1].
Based on data from Grigor’ev VA, Zorin VM, editors. Thermal and nuclear power plants.
Handbook, (in Russian). 2nd ed. Moscow: Energoatomizdat Publishing House; 1988. 625 pp;
Margulova TC. Nuclear power plants, (in Russian). Moscow: Izdat Publishing House; 1955.
289 pp.
Fig. 4.27 T-s diagram for the 600-MW el BN-600 SFR NPP Rankine steam-turbine cycle [1].