Page 523 - Marine Structural Design
P. 523

Chapter 28 ProbabiZity and Risk Based Inspection Planning             499


                                                        t

                                                  System Definition
                                          * Defines System, System Boundary,
                                           and fitness for purpose criteria
                                          * Collect Information
                                                        I



                                          * Define Failure Modes
                      r-                  * Identify Consequence
                                          * Define Failure Criteria
                      I
                      I
                      I
                      I
                      I            (1) Failure Modes, Effects, and Critically Analysis
                      I              * Redefine Failure Modes
                      I              * Redefine Failure Causes                   I-
                      I              * Redefine Failure Consequence
                                     * Assess Failure Probabilities for the Fitness for Purpose
                      I              * Assess Consequences
                                     * Risk Evaluation
                      I
                      I
                      Risk
                     Analysi
                      I
                       I
                      I           (2) Development of Risk Based Inspection Program
                                     * Choose Potential Inspection Strategies
                      I               (Frequency, Methods, Sampling Procedures)
                       I             * Define Potential for Damage States
                                     * Define Potential Damage for Inspection Damage
                       I----
                                     * Estimate Effect of Inspection on Failure Probabilities
                                     * Choose Inspection Strategy and Perform Inspection
                                     * Perform Sensitive Studies
                                     * Choose Appropriate Inspection, Maintenance,
                                      Repair (IMR) System
                                 I





                              Figure 28.1  Risk-based Inspection Process (Xu et al, 2001)
   518   519   520   521   522   523   524   525   526   527   528