Page 529 - Marine Structural Design
P. 529

Chapter 28 Probability and Risk Based Inspection Planning             505


                               4.0  ,
                               3.5
                               3.0

                            c   2.5
                            L
                            c3  2.0
                               1.5  ~  -POD=90%                    f
                                        POD=95%
                               1 .o




                               4.0
                               3.5

                               3.0
                            4  2.5
                            d
                               2.0   - POD=80%
                               1.5   -A-   POD=90%
                               1 .o
                                   0    5   10   15   20   25   30   35
                                                 t, years
                                   (2) Intermediate Survey
                               4.0
                               3.5

                               3.0
                            4  2.5
                            d
                               2.0   4- POD=80%
                               1.5   -A-   POD=90%
                                    - POD=95%
                               1 .o
                                   0   5    10   15   20   25   30   35
                                                  t, years
                                  (3) Special Survey
                            Figure 28.4  Time-Variant Reliability with Risk of C1 and L3
                                       Combination
   524   525   526   527   528   529   530   531   532   533   534