Page 203 - Offshore Electrical Engineering Manual
P. 203

190    CHAPTER 1  Notes on Design Project Organization and Documentation
























































                         FIGURE 3.1.4
                         A typical cable rack loading calculation sheet.
                           6.   Panel general arrangement
                               Before panel wiring and schematic diagrams are produced, either by the manu-
                             facturer or by the design contractor, it is necessary to produce a drawing giving
                             arrangement details for the panel. The layout of any control panel is important
                             from both the ergonomic and safety point of view, and producing this draw-
                             ing also assists the designer in the selection of switches, pushbuttons, lamps,
                             annunciators, etc.
   198   199   200   201   202   203   204   205   206   207   208