Figure 10  Temperature profile for a two-tower operation.



                 1.  For given gas flow rate V (MMSCF/d) and water content Y 1
                    (lbs H 2 O/MMSCF), calculate the water to be adsorbed from the
                    gas as

                         Water adsorbed   VY 1
                                        ¼                                 ð9Þ
                              Cycle        3
                    Assuming three cycles, each cycle is 8 h in one day.
                 2.  If the particle size of the bed is known D P (ft), calculate the
                    superfacial velocity
                                                    1=2

                              ft                D P
                         V g       as  V g ¼ 540                         ð10Þ
                             min                  g
                                                 3
                    where   g is the gas density (lb/ft ).
                 3.  Calculate the bed diameter d (ft) from
                                        1=2
                              25VZ g T g
                         d ¼                                             ð11Þ
                                PV g
                                                    2
                 4.  Calculate the water loading q (lbs/ft h) using

                                   VY 1
                         q ¼ 0:053                                       ð12Þ
                                    d 2





 Copyright 2003 by Marcel Dekker, Inc. All Rights Reserved.