Page 326 - Petroleum and Gas Field Processing
P. 326
Figure 10 Temperature profile for a two-tower operation.
1. For given gas flow rate V (MMSCF/d) and water content Y 1
(lbs H 2 O/MMSCF), calculate the water to be adsorbed from the
gas as
Water adsorbed VY 1
¼ ð9Þ
Cycle 3
Assuming three cycles, each cycle is 8 h in one day.
2. If the particle size of the bed is known D P (ft), calculate the
superfacial velocity
1=2
ft D P
V g as V g ¼ 540 ð10Þ
min g
3
where g is the gas density (lb/ft ).
3. Calculate the bed diameter d (ft) from
1=2
25VZ g T g
d ¼ ð11Þ
PV g
2
4. Calculate the water loading q (lbs/ft h) using
VY 1
q ¼ 0:053 ð12Þ
d 2
Copyright 2003 by Marcel Dekker, Inc. All Rights Reserved.