Page 325 - Petroleum and Gas Field Processing
P. 325

Figure 9  Breakthrough diagram in a fixed bed.




            12.5.2  Design of Adsorber for Gas Dehydration
            Usually, the given process conditions are gas flow rate V (MMSCF/d),

            temperature T ( R), gas water content Y 1 (lbs H 2 O/MMSCF), desiccant
                                               3
            particle size D P (ft), gas density   g (lbs/ft ), and operating pressure P (psia).
            The  maximum    useful  desiccant  capacity  X C  (lbs  H 2 O/100 lbs
            desiccant) is given by the vendor it will change if the storage conditions
            are not good. It should be assumed and then verified in the calculations.
            The bed operation cycle time is usually assumed as 8 h; thus, one day has
            three cycles.






 Copyright 2003 by Marcel Dekker, Inc. All Rights Reserved.
   320   321   322   323   324   325   326   327   328   329   330