      Fig.9.Pipcwall thickness statistics - maximum values - operation 2.
        When the inspection vehicle was run in operation 2 (March,  1989), it was
      important to assess the exact nature and extent  of the girth weld  corrosion
      found in operation  1, and also to determine any "corrosion growth rate".
        Having an assessment of this "corrosion growth rate" would allow BP to:

           a)  take  steps  to  consider  changing the  operating  conditions  of  the
              pipeline;
           b) to assess the long-term viability of the pipeline with respect to future
              perceptions  of throughput;
           c)  satisfy  the  appropriate  regulatory authorities that all actions  were
              being taken to operate  the pipeline in a safe manner.

        The results obtained  in operation  2 were  therefore given as before, i.e.
      listings of pipe-wall thickness and girth-weld corrosion severity. However, as
      an  additional  aid  to  viewing  and  understanding  the  results,  they  were