Page 34 - Pipeline Rules of Thumb Handbook
P. 34

General Information  21

           Color codes for locating underground utilities






























           Approximate angle of repose for sloping sides of excavations


           Note: Clays, SIMs, Loams or Non-
           Hemorporus Soils Require Shoring
           and Bracing

           The presence of ground water requires
           special treatment.
   29   30   31   32   33   34   35   36   37   38   39