Route Optimization, Tie-in and Protection 323
17.6 Equipment Dayrates
The costs for installation equipment vary each season, generally depending on its availability.
These costs play an important part in the selection of the chosen method of instaIIation.
It is recommended that respective installation contractors be contacted should a costing
exercise be conducted.
17.7 References
1. Ellinas, C.P., “J-Tube Method of Riser Installation”, Offshore Pipeline Engineering, Park
Lane Hotel, April 1986.
2. Langford, G., Kelly, PG., (1990) “Design, Installation and Tie-in of Flowlines”, JPK
Report Job No. 4680.1.
3. Phillips, P.W.J., “The Development of Guidelines for the Assessment of Submarine
Pipeline Spans, Overall Summary Report”, HMSO, 1986.