         17.6  Equipment Dayrates
         The costs for installation equipment vary each season, generally depending on its availability.
         These costs play an important part in the selection of the chosen method of instaIIation.

         It  is  recommended that  respective installation contractors be  contacted  should a  costing
         exercise be conducted.


         17.7  References
         1.  Ellinas, C.P., “J-Tube Method of Riser Installation”, Offshore Pipeline Engineering, Park
            Lane Hotel, April 1986.
         2.  Langford, G., Kelly, PG.,  (1990)  “Design, Installation and  Tie-in  of  Flowlines”, JPK
            Report Job No. 4680.1.
         3.  Phillips,  P.W.J.,  “The  Development of  Guidelines for  the  Assessment of  Submarine
            Pipeline Spans, Overall Summary Report”, HMSO, 1986.