Steam Turbines and  Turboexpanders   339

                  Overhaul Procedures

                    Each plant has  established specific overhaul procedures.  Typically
                  they would feature points like:
                      1.  Safety requirements
                     2. Worklist
                     3.  Bar chart
                     4.  Material list and equipment catalog
                     5. Tool list
                     6.  Special service and equipment list
                     7.  Procedures:
                         alignment
                         flexible diaphragm coupling
                         bearing assembly
                         casing
                         rotor assembly
                         internals
                         interstage seals
                         design clearances
                     8.  Field notes
                     9.  Clearance inspection forms
                     10. Critical path method chart
                     1 1. Photographs
                    Based  on the  steam  turbine  manufacturer’s  specific operating  and
                  maintenance instructions these documents are an invaluable part of the
                  technical inventory of petrochemical plant maintenance departments  .4



                         Special Purpose Steam Turbine Operation and Malntenance

                    As petrochemical process machinery increases in complexity, proper
                  coordination of the operating and maintenance functions becomes an im-
                  portant aspect of machinery management. Someone once observed in an
                  exaggerated way that if one could see the “gray line” between machinery
                  operation and maintenance functions one would  be in trouble.  Large
                  steam turbines are no exception. A good example would be the running
                  in and startup of a special purpose turbine after an extensive overhaul. A
                  good machinery maintenance person will not wallc away after the over-
                  haul-his  job seems never done. For instance careful carbon ring break-
                  in is often ignored or bypassed based on the justification of  getting the
                  turbine on line a few hours sooner.