Steam Turbines and Turboexpanders   427


                  Note:  The expander inlet screen should be positioned where it can be
                        conveniently removed for cleaning and still not interfere with the
                         operation of the safety shutdown valve.

                    Refer,  also, to  the  maximum  allowable pipe  nozzle  load  drawing,
                  which experienced vendors will furnish.

                  Seal Gas System

                    Connect the plant’s seal gas supply to the filters on the control panel.
                  Refer to vendor-supplied data for requirements and to the system sche-
                  matic and control panel drawings for location.

                   Lube Oil Cooler
                    If  the oil system incorporates air cooling, connect proper voltage to
                  each air-fan motor. Install, set and test vibration switch.

                  Variable Nozzles
                    After installing the nozzle actuator, connect the plant instrument air
                  supply and air signal line to the variable nozzle positioner. The vendor
                  should have provided data on pertinent pressures.
                  Safety Shutdown Valve

                    The expander shutdown valve (with solenoid) should be placed in the
                  process piping at the expander inlet. See that it does not interfere with the
                  screen. An adequate air supply must be connected to the solenoid valve to
                  enable the safety trip valve to close within onehalf second or less.

                  Electrical Connections

                    Refer to the system schematic and/or electrical schematic (or wiring
                  diagram) for wiring, and any applicable component manufacturer’s data.
                  On all components, care must be taken to use the terminal combinations
                  for the voltage to be used.

                    Veri&  that all switching power feeders and circuit breakers are locked
                  out in the off position when connecting the power supply.

                  NOTE: To  avoid electrical abuse, make certain that sensor lines to the
                          various switches are properly connected to the plug-in circuit
                          boards inside the junction box and not shorted to ground.