Page 33 - Practical Well Planning and Drilling Manual
P. 33

Section 1 revised 11/00/bc  1/17/01  2:55 PM  Page 9








                                                 Preliminary Work for the Well Design  [      ]
                                                                                  1.1.2





                              Parameters,  Comments  KCl Polymer mud  0.49 psi/ft  Tight hole on conns  1171–1295  Backreamed,  no further   problems  7–20 m/hr  Checktrip @ 1353  no drags  100k o/pull @ 1350   POH  WOB 35–55  RPM 120–140  Ream 1 time before   conns  Pulled doing 7 m/hr








                              Bitrun Data  ATM05, 18-13-13  Locked BHA  | |  | |  | |  | |  | |   | |  | |  | |  | |  -| |-  | |  | |  | |  | |  | |  | |  | |  | |  \/  Bit pulled 1843, 759   @ 11.3  1/1/BT/M/F/I/ID/PR,   PI 29.0  ----------






                         Well 2  Depth  BRT  1084





                              Parameters,  Comments  KCl Polymer mud  0.49 psi/ft  Tight hole  on conns  WOB 30–55  RPM 100–150  Pulled doing 8 m/hr  Hole good on trip  Started drilling at  7m/hr









                              Bitrun Data  ATM05, 20-13-13  Locked BHA  | |  | |  | |  | |  | |  | |  | |  | |  | |  | |  \/  Bit pulled at 1531  521 @ 15.8 m/hr, PI   33.6  1/1/BT/A/E/I/JKD/PR  ----------  ATM22GD, 20-13-13  Locked BHA  | |  | |





                         Well 1  Depth   BRT  1010






                              Formation   Details  Guitar  LSt, Sh interbeds  Lst: RPM sensitive  Sh: WOB sensitive  Compressive   strength  9—12,000 psi with   Shale streaks  to 18,000  Cavings @ <.5 psi/ft  Losses @ >.5 psi/ft  Tight hole on trips,  can pull through  with care







                     Fig. 1—1  Example of a Hole Section Summary

                                                      9
   28   29   30   31   32   33   34   35   36   37   38