Section 1 revised 11/00/bc 1/17/01 2:55 PM Page 10
[ ] Well Design
1.1.2
Started drilling at 7 m/hr 7 m/hr 12 m/hr Average parameters: WOB/RPM 30– 47/110–130 GPM/PSI 600/2100 Mud 0.49 psi/ft Torque 5000 ft/lbs 10 m/hr average 10 m/hr
ATM11HG, 18-13-13 Locked BHA | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
1870
WOB 30–60 RPM 100–150 ROP increased to 12 Hole good on trip WOB 30–55 RPM 100–150 Existing crack in DC? No torque indication seen. WOB 10–50 (TQ) RPM 110–140 Crooked hole?
Bit pulled 1964; 433 @ 7.6 Bit pulled 2111; 52 3/2/CT/H/E/I/NO/TQ,
| | | | | | | | \/ @ 7.3 2/1/NO/A/E/I/NO/TQ, PI 16.7 ---------- MF27D, 20-16-16 Locked BHA \/ Bit pulled 2059; 95 0/0/NO/A/E/I/NO/ TW , PI 8.8 ---------- MF27D, 20-15-15 \/ @ 4.1 PI 2.7 ----------
(892) 1902 (244)
Plectrum Sst, Lst, Sltst, Sh Total losses possible Compressive strength 6ñ9000 psi with shale streaks to 15,000 psi Increasing Sst with depth
Fig. 1—1 Example of a Hole Section Summary, continued