Page 360 - Practical Well Planning and Drilling Manual
P. 360
Section 3 revised 11/00/bc 1/17/01 12:00 PM Page 336
[ ] Practical Wellsite Operations
3.1.11
Figure 3-4 Rig Takeover—General Checklist (cont’d)
Chemical storage: Is area (especially hazardous chemicals) clean, tidy, appropriate
notices displayed? Wash station ready to use? Crews using cor-
rect safety clothing? Are damaged chemical containers correctly
disposed of?
Rig housekeeping: Is rubbish stored correctly and disposed of regularly? Is the
area around the compactor/burn pit/rubbish skip also clean?
Office: When is next BOP test due?
Kick sheets prepared?
Current and planned operations, logistics.
Pipe tally correct? Strap pipe next trip if any doubt.
336