Section 3 revised 11/00/bc  1/17/01  12:00 PM  Page 337














                                                                       [ ]


                                                                           3.2





















                                                                Drilling Fluid




                           Section 2.5 covers drilling fluid types and properties in detail. This
                       should be referred to as required. Maintenance of that mud on the rig
                       involves maintaining the programmed mud properties by various
                       chemical treatments and by using the solids control equipment to
                       remove detrimental drilled solids from the system.
                           Chemical mud maintenance and treatment is a large and special-
                       ized area, outside the scope of this book.



                       3.2.1.  Solids Control

                           For rig site drilling engineers, a thorough understanding of the
                       mechanical processes and equipment used to remove undesirable
                       solids is necessary. The equipment is simple in principle, but in prac-
                       tice problems can sometimes be hard to diagnose. Drilling crews often
                       do not have a good understanding, and so it is essential for the rig
                       supervisors to check on the equipment and educate the drill crews so
                       that problems are spotted and solved early.