Page 465 - Practical Well Planning and Drilling Manual
P. 465

Appendix NEW! revised 11/00/bc  1/30/01  3:29 PM  Page 441














                                                    [    ]


                                                       Appendix:2





















                                           Formation Integrity Test
                                                 Recommended Procedure





                           An FIT is performed to determine MAASP and to check the integri-
                       ty of the seal of cement around the shoe. There are two types: a limit
                       test (where the test is stopped at a predetermined maximum if no
                       leakoff occurs) and a leakoff test (where the test is continued until
                       leakoff is seen). The techniques for both are the same. A limit test is
                       performed to a pressure which confirms the ability of the well to con-
                       tain a gas kick of a specified influx volume at the next casing depth
                       where formation pressures are known. A leakoff test is used where pore
                       pressures are not well-known or on exploration wells.
                           A leakoff test yields more information—knowing the pressure to
                       just initiate leakoff gives information relating to the minimum field
                       stresses. A limit test would be appropriate when a very brittle forma-
                       tion is exposed that should not be fractured (i.e., limestone).
                           An FIT should be carried out after drilling out any casing where a
                       BOP is in use. The drilling program will determine whether it is to be
                       done as a limit or leakoff. An FIT can also be repeated within a hole


                                                     441
   460   461   462   463   464   465   466   467   468   469   470