PROBLEMS


                                        pillar, where   is the pillar stiffness in the post-peak regime. For various width/height
                                        ratios, in situ tests produced the following results:
                                              Width/height ratio   1.0       1.33      1.85      2.14
                                                /                 −0.60     −0.43     −0.29    −0.23

                                          Analysis of convergence at the pillar position for distributed normal loads, P,of
                                        various magnitudes applied at the pillar position, yielded the following results:
                                             P(MN)                     0.0     125.0    220.0    314.0
                                                               −3
                                             Convergence (m × 10 )    32.0      22.0     14.0      6.0
                                        Assess the stability of the pillar.