Page 611 - Rock Mechanics For Underground Mining
P. 611

REFERENCES

                                        Brown, S. M., Leijon, B. A. and Hustrulid, W. A. (1986) Stress distribution within an artificially loaded
                                          block. Proc. Int. Symp. on Rock Stress and Rock Stress Measurement, Stockholm (ed. O. Stephansson),
                                          429–40. Centek: Lule˚a.
                                        Brummer, R. K. and Andrieux, P. P. (2002) A design methodology for destress blasting. Mining and
                                          Tunnelling Innovation and Opportunity, Proc. 5th North Am. Rock Mech. Symp. & 17th Tunn. Assn Can.
                                          Conf., Toronto (eds R. Hammah, W. Bawden, J. Curran and M. Telesnicki), 1: 165–72. Univ. Toronto
                                          Press: Toronto.
                                        Brummer, R.K. and Swan, G. R. (2001) Support and structural use of shotcrete in mines. Underground
                                          Mining Methods: Engineering Fundamentals and International Case Studies (eds W. A. Hustrulid and
                                          R. L. Bullock), 593–600. Society for Mining, Metallurgy and Exploration: Littleton, Colorado.
                                        Brune, J. N. (1970) Tectonic stress and the spectra of seismic shear waves from earthquakes. J. Geophys.
                                          Res., 75: 4997–5009; correction (1971), 76: 5002.
                                        Bryan, A., Bryan, J. G. and Fouch´e, J. (1964) Some problems of strata control and support in pillar
                                          workings. Min. Engr, 123(41): 238–66.
                                        Bucky, P. B. (1956) Fundamental considerations in block caving. Q. Colo. School Mines, 51(3): 129–46.
                                        Bucky, P. B. and Taborelli, R. V. (1938) Effects of immediate roof thickness in longwall mining as deter-
                                          mined by barodynamic experiments. Trans Am. Inst. Min. Metall., 130: 314–32.
                                        Bull, G. and Page, C. H. (2000) Sublevel caving – today’s dependable low-cost “ore factory”. Proc.
                                          MassMin 2000, Brisbane (ed. G. Chitombo), 537–56. Aust. Inst. Min. Metall.: Melbourne
                                        Bunting, D. (1911) Chamber pillars in deep anthracite mines. Trans Am. Inst. Min. Engrs, 42: 236–45.
                                        Butcher, R. J. (2000) Block cave undercutting – aims, strategies, methods and management. Proc. MassMin
                                          2000, Brisbane (ed. G. Chitombo), 537–56. Aust. Inst. Min. Metall.: Melbourne.
                                        Butcher, R. J. (2002) Personal communication.
                                        Carlsson, A, and Christiansson R. (1986) Rock stresses and geological structures in the Forsmark area.
                                          Proc. Int. Symp. on Rock Stress and Rock Stress Measurement, Stockholm (ed. O. Stephansson), 457–66.
                                          Centek: Lule˚a.
                                        Carranza-Torres, C., Alonso, E., Alejano, L. R., Varas, F. and Fdez-Manin, G. (2002) Elasto-plastic analysis
                                          of deep tunnels in brittle rock using a scaled form of the Mohr-Coulomb failure criterion. Mining and
                                          Tunnelling Innovation and Opportunity, Proc. 5th North Am. Rock Mech. Symp. & 17th Tunn. Assn Can.
                                          Conf., Toronto (eds R. Hammah, W. Bawden, J. Curran and M. Telesnicki), 1: 283–93. Univ. Toronto
                                          Press: Toronto.
                                        Carranza-Torres, C. and Fairhurst, C. (1997) On the stability of tunnels under gravity loading, with post-
                                          peak softening of the ground. NY Rocks ’97, Linking Science to Rock Engineering, Proc. 36th U. S. Rock
                                          Mech. Symp., New York (ed. K. Kim), 2: 791–803. Columbia University: New York.
                                        Carranza-Torres, C. and Fairhurst, C. (1999) The elasto-plastic response of underground excavations
                                          in rock masses that satisfy the Hoek-Brown failure criterion. Int. J. Rock Mech. Min. Sci., 36(6):
                                          777–809.
                                        Cartwright, A. P. (1969) West Dreifontein – Ordeal by Water. Goldfields of S. Afr.: Johannesburg.
                                        Cassie, J. W., Altounyan, P. F. R. and Cartwright, P. B. (1999) Coal pillar design for longwall gate entries.
                                          Proc. 2nd Int. Workshop on Coal Pillar Mechanics and Design, Vail (eds C. Mark, K. A. Heasley, A.
                                          T. Iannocchione and R. J. Tuchman), 23–32. NIOSH IC 9448. U. S. Dept. Health & Human Services:
                                          Pittsburgh.
                                        Chamber of Mines of South Africa (1988). An Industry Guide to Ameliorating the Hazards of Rockfalls
                                          and Rockbursts. Chamber of Mines: Johannesburg.
                                        Charlton, T. M. (1959) Energy Methods in Applied Statics. Blackie: London.
                                        Chatterjee, P. K., Just, G. D. and Ham, G. I. (1974) Design and evaluation of sublevel caving by dynamic
                                          digital simulation. Proc. 12th Symp. on the Applications and Mathematics in the Minerals Industry (eds
                                          T. B. Johnson and D. W. Gentry), 2: G153–77. Colo. School Mines: Golden.
                                        Chatterjee, P. K., Just, G. D. and Ham, G. I. (1979) Sub-level caving simulation of 3000 pillar recovery
                                          operation at Mount Isa Mine, Australia. Trans Instn Min. Metall., 88: A147–55.
                                        Chen, D. (2000) Meeting geotechnical challenges–akey to success for block caving mines. Proc. MassMin
                                          2000, Brisbane (ed. G. Chitombo), 429– 36. Aust. Inst. Min. Metall.: Melbourne.
                                        Clifford, R. L. (1974) Long rockbolt support at New Broken Hill Consolidated Limited. Proc. Aust. Inst.
                                          Min. Metall., 251: 21–26.
                                        Clough, R. W. and Penzien, J. (1975) Dynamics of Structures. McGraw Hill: New York.
                                        Coates, D. F. (1981) Rock Mechanics Principles, 3rd edn. Mines Branch Monograph 874, Information
                                          Canada: Ottawa.

                                        593
   606   607   608   609   610   611   612   613   614   615   616