Page 169 - Shale Shakers Drilling Fluid Systems
P. 169

152   SHALE SHAKERS AND DRILLING FLUID SYSTEMS



             When balanced cones no longer operate with       Hydrocyclone installation Tips
             spray discharge, either too many solids are
             being presented for design processing, large        • Hydrocyclones should be located so that under-
             solids have plugged the manifold or apex, or          flow can be removed with a minimum of
             the feed pressure is incorrect. If the feed           trouble and wash-down water. They should
             pressure is correct at 75 feet of hydraulic           be located so they are accessible for main-
             head, often the inability to maintain spray           tenance and evaluation.
             discharge can be attributed to the shale shak-
             ers. Check for torn screens, open bypass, or       • Discharge overflow should return to the cir-
             improperly mounted screens. Additionally,             culating system into a compartment immedi-
             ensure that there are sufficient hydrocyclones        ately downstream of the suction compart-
             to process the total fluid being circulated by        ment. At the same time, the discharge overflow
             the mud pumps.                                        compartment must be bottom equalized with
                                                                   the suction compartment and drilling fluid
             Install a low ("bottom") equalizer to permit          should backflow from the discharge tank into
             backflow from the discharge tank into the suc-        the suction tank at all times. The hydro-
             tion compartment. Removable centrifugal pump          cyclones should process all drilling fluid en-
             suction screens reduce plugging problems.
                                                                   tering its suction compartment. Ensure that
             Operate hydrocyclones at the recommended              all drilling fluid entering the discharge compart-
             feed head of approximately 75 feet. Efficiency        ment has been processed by the hydrocyclones.
             is decreased by operating at too low a feed
             head. Operating at too high a head wears           • Centrifugal feed pumps should be located so
             hydrocyclone parts and yields insignificant           that they have flooded suction, minimum
             separation improvements.                              suction line length, with few elbows and turns
                                                                   to minimize friction losses.
             Do NOT use the same pump to feed the desilter
             and desander. Each unit should have its own        • A centrifugal pump may stir its suction
             centrifugal pump(s).                                  compartment with mud guns. Mud jet mixers
             Run the desilter continuously while drilling with     should not be supplied with fluid from other
             unweighted mud and process 100% of the to-            parts of the drilling fluid system. Preferably,
             tal surface pit volume after beginning a trip.        mechanical agitators should be used in the
                                                                   removal section.
             Operate the desander when shale shakers will
             not screen down to 140 mesh (100 microns).         • Keep the end of the discharge line above the
             Install a guard screen with approximately             surface of the mud in the receiving tank to
             half-inch openings to prevent large debris            avoid creating a vacuum. Overflow should be
             from entering and plugging the inlets and/or          introduced into the next compartment down-
             cone apexes.                                          stream at approximately a 45° angle so lines
                                                                   will be kept full and a siphoning vacuum,
             Regularly check cones for bottom plugging or          which would pull more solids into the over-
             flooding. Desilter cones will plug more often         flow discharge, avoided. When hydrocyclones
             than desander cones. Plugged cones may be             are mounted more than five feet above the
             cleaned with a welding rod. A flooded cone            liquid level of the mud tanks, a siphon breaker
             indicates a partially plugged feed or a worn          should be installed in the overflow manifold
             cone bottom section.
                                                                   from the cones.
             Between wells, or when drilling is interrupted,
             flush manifolds with water and examine the       Conclusions
             inside surfaces of the cones.
             Keep the shale shaker well maintained and          Hydrocyclones are simple, easily maintained
             never bypass it.                                 mechanical devices without moving parts. Sepa-
                                                              ration is accomplished by transfer of kinetic input,
             Hydrocyclones discard absorbed liquid with       or feed energy, into the centrifugal force inside the
             the drilled solids. Discharge solids dryness is  cone. The centrifugal force acts on the drilling
             a function of the apex opening relative to the   fluid slurry to rapidly separate drilled solids and
             diameter of the vortex finder.
                                                              other solid particles in accordance with Stokes' Law.
             Mud cleaners and/or centrifuges can be used        The solids generated while drilling in some for-
             to process the cones underflow.                  mations are too fine for shale shakers to remove.
   164   165   166   167   168   169   170   171   172   173   174