8 - PROJECT QUALITY MANAGEMENT






                   statement of confidence that the software processes will (or will not) produce software products that conform to
                   their requirements and will satisfy users’ needs.

                      SQA thus covers more than audits of requirements and the results of software quality measurements. SQA
                   comprises a full set of planned and systematic activities that can be demonstrated to provide confidence that a
                   product or service will fulfill its requirements for quality. SQA uses the classic tools of audits and review of both
                   internal and external SQC activities, including demonstrations, inspections, analyses, and testing (often divided into
                   verification testing and validation testing). Both SQA and SQC personnel may be involved in analysis of defects and
                   other problems and making recommendations for improvement.
                                                                                                                          8
                      IEEE standards that may be useful include IEEE Standard 829 – Software and System Test Documentation [30]; IEEE
                   Standard 1008 – Unit Testing [31]; and IEEE Standard 1012 – System and Software Verification and Validation [32].


                   8.2.1 Perform Quality Assurance: Inputs


                      The inputs for performing quality assurance in Section 8.2.1 of the PMBOK  Guide are applicable to performing
                                                                                    ®
                   quality assurance for software projects.


                   8.2.1.1 Quality Management Plan

                      See Section 8.2.1.1 of the PMBOK  Guide.
                                                   ®

                   8.2.1.2 Process Improvement Plan

                      See Section 8.2.1.2 of the PMBOK  Guide.
                                                   ®


                   8.2.1.3 Quality Metrics

                      See Section 8.2.1.3 of the PMBOK  Guide.
                                                   ®

                   8.2.1.4 Quality Control Measurements

                      See Section 8.2.1.4 of the PMBOK  Guide.
                                                   ®

                   8.2.1.5 Project Documents


                      See Section 8.2.1.5 of the PMBOK  Guide.
                                                   ®
                      Additional considerations for project documents that provide inputs for performing software project and product
                   quality assurance include the following: the release plan and test plan, project or organizational procedures, project
                   records and test result records, and reports from design and code reviews, inspections, and audits. Automated
                   tools for requirements management, software configuration management, release management, and problem