4 - PROJECT INTEGRATION MANAGEMENT
4.4.2.2 Analytical Techniques
See Section 4.4.2.2 of the PMBOK Guide.
®
4.4.2.3 Project Management Information System
See Section 4.4.2.3 of the PMBOK Guide. 4
®
4.4.2.4 Meetings
See Section 4.4.2.4 of the PMBOK Guide.
®
4.4.3 Monitor and Control Software Project Work: Outputs
The outputs for monitoring and controlling project work in Section 4.4.3 of the PMBOK Guide are applicable
®
outputs for monitoring and controlling software projects, with the following extension to 4.4.3.2.
4.4.3.1 Change Requests
®
See Section 4.4.3.1 of the PMBOK Guide.
4.4.3.2 Work Performance Reports
®
Work performance reports for software project, in addition to those in Section 4.4.3.2 of the PMBOK Guide include:
• Updates to estimates (product size, delivered quality, delivery date, final cost);
• Team productivity measures such as velocity metrics and burndown and burnup charts;
• Feature backlogs; and
• Configuration management reports.
4.4.3.3 Project Management Plan Updates
See Section 4.4.3.3 of the PMBOK Guide.
®
4.4.3.4 Project Documents Updates
See Section 4.4.3.4 of the PMBOK Guide.
®