Page 215 - Solar Power in Building Design The Engineer's Complete Design Resource
P. 215

LEED    185


               humidity control for specified climate zones and another for the installation of a per-
               manent central temperature and humidity monitoring and control system.

               Daylight and views, credit no. 8 Simply stated, this measure promotes an archi-
               tectural space design that allows for maximum outdoor views and interior sunlight
               exposure. One credit is awarded for spaces that harvest indirect daylight for 75 percent
               of spaces occupied for critical tasks. A second point is awarded for direct sight of
               vision glazing from 90 percent of normally occupied work spaces. Note that copy
               rooms, storage rooms, mechanical equipment rooms, and low-occupancy rooms do
               not fall into these categories. In other words 90 percent of the work space is required
               to have direct sight of a glazing window. Some architectural design measures taken to
               meet these requirements include building orientation, widening of building perimeter,
               deployment of high-performance glazing windows, and use of solar tubes.


               INNOVATION AND DESIGN PROCESS
               Innovation in design, credit no. 1 This measure is in fact a merit award for an
               innovative design that is not covered by LEED measures and in fact exceeds the
               required energy efficiency and environmental pollution performance milestone guide-
               lines. The four credits awarded for innovation in design are: (1) identification of the
               design intent, (2) meeting requirements for compliance, (3) proposed document sub-
               mittals that demonstrate compliance, and finally (4) a description of the design
               approach used to meet the objective.

               LEED-accredited professional, credit no. 2 One point is credited to the proj-
               ect for a design team that has a member who has successfully completed the LEED
               accreditation examination.

               Credit summary


                  Sustainable sites         10 points
                  Water efficiency           3 points
                  Energy and atmosphere     8 points
                  Material and resources    9 points

                  Indoor environmental quality  10 points
                  Innovation in design      2 points

               The grand total is 42 points.


               OPTIMIZED ENERGY PERFORMANCE SCORING POINTS
               Additional LEED points are awarded for building efficiency levels, as shown in Table 7.3.
                  Project certification is based on the accumulated points, as shown in Table 7.4.
   210   211   212   213   214   215   216   217   218   219   220