Page 139 - Standard Handbook Petroleum Natural Gas Engineering VOLUME2
P. 139

n
                                                                                                                    w
                                                                                                                    8
                                                                                                                    !/
                                                                                                                    0
                           Fkw by heads, swpbbing. etc.   The 5Shaped Cum. Shut-in at                               Ei'
                           Them em many variations caused   surface, return of gas into 801~-   Packer failed. reset, and held.   Run away dock. Clock spring
                                                                      Remvered some mud and reservoir
                                                                                          released when tool WBS  opened.
                           by avebblng. fkw by heeds, choke   tbn, small permeable zona In   fluids in reduced amount8.   Reuwery Included formation
                           Plugghg. etc. Recovery hCludeS   tight llquld Wiled formath,   fluids in normal amounts.
                           reservoir  fluids. Swabbing may-   etc.. glve such cum durlng build-
                           cause a pmssure decline If  Huid   up. Recovery Includes reservoir
                           levels am lawsred.   fluids in normal amounts.
                                                         I
                                              TWI failed  IO  open.  NO fluid   Clock dld not run. Recovered   Clock stoppad on opening tool
                           TWI felled to close. No bund-   excepl maybe a litlle mud is   reservoir flulds In normal   and started agah when tool
                           up 1s obtained. Recovery includea   recavered. Measured pmssure   amount.   was shut in. Recovered resenroir
                           brmsSon flulda     may tend to decllne to that                 flulds In normal quantities.
                                              In the reservoir.
                                                n





                           PdmrYMandmuMnot    Pedcer falled at tlme of shutln.   Uniform siii in clock   Clock stopped upon maching
                                                                                          bottom and started when started
                           be mset. Recovered mud wlth   Reawered reservoir Huids in   mechanism. Tlm scale is In   mmhlg out of hole. Recovered
                                                       some
                           very llllle brmatbn fluld.   normal amounts ~JXI mud as   error. Recovered reservolr   reservoir flulds In normal
                                              mqulred to equalii pressure.   Nuids In normal amount&
                                                                                          quantities.
                                                          Figure 5-63. Continued.
   134   135   136   137   138   139   140   141   142   143   144