Page 414 - Standard Handbook Petroleum Natural Gas Engineering VOLUME2
P. 414

380    Production

                           1       I
                        p;


                                                                                 GOR









                                                   I
                                                dsc
                                                    ine
                       Rs i                     pressure\
                           I       I
                                   I
                                   fb






















                    Figure 6-10.  Schematic representation reservoir pressure (P) and GOR vs.
                    time and mass and composition in reservoir differential vaporization process.


                                Sampllng Process and Laboratory Measurements
                      The overall quality of the reservoir fluid study and the subsequent engineering
                    calculations based upon that study can be no better than the quality of the fluid
                     samples originally collected during the field sampling process.
                      Samples representative of  the original reservoir can be obtained only when  the
                     reservoir pressure is equal to or higher than the original bubble point or dew point.
                       The pressure drawdown associated with  normal production rates will  cause
                     two-phase flow near  the wellbore  if  the fluid  in  the  formation was  initially
                     saturated or only slightly undersaturated. Relative permeability effects may  then
                     cause the material entering the wellbore to be different from the original overall
                    (total) composition fluid existing at the boundary of drainage area. The problem
   409   410   411   412   413   414   415   416   417   418   419