Page 330 - Sustainable On-Site CHP Systems Design, Construction, and Operations
P. 330

Sustaining Operational Ef ficiency of a CHP System     303


                A technician checks the pump controller, finds that the operating range and calibra-
             tion are not correct, and replaces the table for these variables in the control code with a
             table from the manufacturer based on testing the pump in the system (before initial
             firing). Upon replacing the table and waiting for the system to reach steady operation,
             the CxV system reports that operation is as expected. This aspect of operation of the
             CHP plant has now been corrected and verified by the CxV system.



        Summary
             In this chapter we provided information on why sustaining operations of CHP is impor-
             tant as well as algorithms for CHP system performance monitoring and commissioning
             verification (CxV), including system-level and component-level performance metrics.
             We also discussed how verification of commissioning can be accomplished by com-
             paring actual measured performance to benchmarks for performance provided by the
             system integrator and/or component manufacturers.
                The CxV scenarios also showed how the results of these comparisons can be auto-
             matically interpreted by software to provide conclusions regarding whether the CHP
             system and its components have been properly commissioned and where problems are
             found, guidance can be provided for corrections. Application of algorithms to CHP
             laboratory and field data has also been illustrated, and the chapter concludes with a
             discussion on how these algorithms can be deployed. Monitoring and verification of
             performance as illustrated in this chapter will become increasingly important as fuel
             prices increase, CHP systems become more widely used, and concern with sustainability
             of our energy systems increases.


        References

             Ardehali, M. M. and T. F. Smith. 2002. “Literature Review to Identify Existing Case
                Studies of Controls-Related Energy-Inefficiencies in Buildings.” Technical Report:
                ME-TFS-01-007. Department of Mechanical and Industrial Engineering, University
                of Iowa, Iowa City, IA.
             Ardehali, M. M., T. F. Smith, J. M. House, and C. J. Klaassen. 2003. “Building Energy
                Use and Control Problems: An Assessment of Case Studies.” ASHRAE Transactions,
                vol. 109, pt. 2, pp. 111–121.
             Brambley, M. R. and S. Katipamula. 2006. Specification of Selected Performance Monitoring
                and Commissioning Verification Algorithms for CHP Systems. PNNL-16068, Pacific
                Northwest National Laboratory, Richland, WA.
             Claridge, D. E., C. H. Culp, M. Liu, S. Deng, W. D. Turner, and J. S. Haberl. 2000. “Campus-
                                             SM
                Wide Continuous Commissioning  of University Buildings.” In Proceedings of the
                2000 ACEEE Summer Study on Energy Efficiency in Buildings. ACEEE, Washington,
                DC.
             Claridge, D. E., J. S. Haberl, M. Liu, J. Houcek, and A. Athar. 1994. “Can You Achieve
                150% Predicted Retrofit Savings: Is It Time for Recommissioning?” In Proceedings
                of the 1994 ACEEE Summer Study on Energy Efficiency in Buildings. ACEEE,
                Washington, DC.
             Claridge, D. E., M. Liu, Y. Zhu, M. Abbas, A. Athar, and J. S. Haberl. 1996. “Implementation
                of Continuous Commissioning in the Texas LoanSTAR Program: Can You Achieve
   325   326   327   328   329   330   331   332   333   334   335