Page 346 - Sustainable On-Site CHP Systems Design, Construction, and Operations
P. 346

PART 6





             Case Studies







               CHAPTER 19                          CHAPTER 23
               Case Study 1: Princeton University   Case Study 5: Governmental Facility—
               District Energy System              Mission Critical
               CHAPTER 20                          CHAPTER 24
               Case Study 2: Fort Bragg CHP        Case Study 6: Eco-Footprint of On-Site
               CHAPTER 21                          CHP versus EPGS Systems
               Case Study 3: Optimal Sizing Using   CHAPTER 25
               Computer Simulations—New            Case Study 7: Integrate CHP to Improve
               School                              Overall Corn Ethanol Economics
               CHAPTER 22                          CHAPTER 26
               Case Study 4: University Campus CHP   Case Study 8: Energy Conservation Measure
               Analysis                            Analysis for 8.5-MW IRS CHP Plant
   341   342   343   344   345   346   347   348   349   350   351