112  TPM-A  Route to World-Class Performance


                   4  Principles  What is the true function of  the adjustment  operation as a
                     whole?
                   5  Causal factors What conditions create the need for adjustment?
                   6  Alternatives What improvements will eliminate the need for adjustment?
                   Figure 5.32 provides a clear visual presentation of  the TPM approach to
                analysing adjustment  operations leading to minimization of  losses. Figure
                5.33 reviews progressively the process from an analysis of the present position
                right through to achieving optimal conditions. Wherever possible, make use
                of  video: it is a very powerful analysis tool.


                                                 W  Progress in reducing set-up times
                                                 W  Variable factors
                           Analyse set-up data      Problems
                                                  W  Points requiring attention
                                 I                W  Equipment mechanisdsystem
                            Study equipment       W  Characteristics
                             characteristics      W  Scope of set-up operation
                                                  W  Shape mechanism, and precision jigs/tools


                                                  W  Time
                          Analyse work methods      Adjustment methods and details
                                                  W  Effectiveness of each operation


                          Set improvement targets   W  Targets based on equipment restrictions
                             (the challenge)      W  Targets based on desired improvement


                                                  W  Tools
                            Preparatory steps
                           (everything to hand)   W  Location
                                              I W  Transport devices

                        Separate internal & external  I  W  External set-up work
                            set-up operations     W  Internal set-up work



                         Establish work sequences   W  Methods, timing
                                                    Workers, spare parts
                            for external set-up
                                                  W  Practise thoroughly
                         Establish work sequences
                            for internal set-up     Co-ordinate work sequences and methods





                 Figuve 5.33 Pvocess of  improving set-up and  adjustment