Page 138 - TPM A Route to World-Class Performance
P. 138

Applying the TPM improvement plan  117

                     0  produce  an  implementation  plan  to  improve  the  equipment
                        reliability.

                   Background
                   Merlin Gun Technology has the following characteristics:
                     0  The company makes welding guns and welding tips.
                     0  Most of  the volume is in welding tips.
                        The co'mpany experiences pressure from customers to produce in small
                        batches.
                     0  The company is expanding into further export markets.
                     0  Department 50 is recognized as the main bottleneck.
                   The company organization is shown in Figure 6.1.

                   Department 50
                   Department 50 makes the most popular welding tips. It has always been the
                   bottleneck department.
                     The department produces basically three types of  tip (Figure 6.2):

                     e  The 5020, a flat-head tip produced in two operations
                        The 5031, a tip with one angled face produced by three operations
                     *  The 5042, a pointed tip with two angled faces produced in %our operations
                   There are three machines:
                     0  The LlOl computer numerically controlled (CNC) lathe
                        The M201 CNC Bridgeport Interact milling machine
                        The M202 Denford Easimill3 milling machine

                     The machine operating data are shown in Figure 6.3. It should be noted
                   that the times have been developed by the planners based on experience. The
                   machines should be capable of  the following cycle times:




                                                 Managing






                       Maintenance                  Production        Ordering
                         Manager                     Manager          Procedure   Control
                                                        I
                       I                           I             I       I
                                                  Dept   Dept   Dept   Despatch
                                                  40      50    60
                   Figure 6.1 Merlin  Gun Technology: organization
   133   134   135   136   137   138   139   140   141   142   143