126  TPM-A  Route to World-Class Performance


                                     Cupboards


                          operation
                          Colchester
                                                                           operation
                          CNC 1000
                          Lathe





                                4              Gangway               F
                       Qp Operator primary location

                Figure 6.11 Department 50 operations layout

                6.5  Equipment history recording
                Newly designed  record forms for cycle time and downtime are shown in
                Figures 6.12 and 6.13 respectively.


                6.6 Assessment  of overall equipment
                      effectiveness

                The OEE is given by the relation OEE = availability x performance x quality.


























                Figure 6.12 Miller M201 equipment history record: operations